Project Client Wynns Role
Sweet Lamb Wind Farm ADAS High level review of archive information and photographic route survey to consider access to Mid Wales from possible marine access locations in West Wales.
Nant y Moch Wind Farm Airtricity/Dulas Full road transport assessment to various possible site access points within the Welsh Tan 8 Forestry Commission Wales Strategic Search Area D.
South Wales TAN 8 Access Studies Airtricity/Dulas Full road transport assessment to various possible site access points within the Welsh Tan 8 Forestry Commission Wales Strategic Search Area E and Area F.
Clashindarroch Wind Farm AMEC Wind Instrument surveys and swept path analysis of access road to site from main trunk road.
Kyle Forest Wind Farm AMEC Wind Transport study to determine appropriate access routes for AIL’s to be delivered to the site including investigations into port access, road transport and swept path analysis of pinch points.
Ray Wind Farm AMEC Wind Transport study to determine appropriate access routes for AIL’s to be delivered to the site including studies into port access and road transport, including instrument survey and swept path analysis.
Coll Wind Turbine Atmos High level desk top review for possible beach landing opportunities for the Island of Coll in consideration of small scale community wind farm scheme.
Lamomby Wind Farm AXIS Additional desk top swept path surveys for site considered in 2003. Larger turbines considered.
Black Law Wind Farm Cadzow Site inspections and swept path analysis of pinch points on route to show access requirements in support of a planning application & movement permissions. Detailed discussions with client on potential transport carrying arrangements to be considered within the surveys.
Pauls Hill Wind Farm Cadzow Turbines could not negotiate a section of the final route to site without significant remedial works. Wynns were called in to assist with emergency survey works to determine the exact amount of remedial action. A solution had to be identified as soon as possible. Wynns carried out immediate site inspection with client and advised on what was necessary. Client arranged for local survey companies to provide base survey information for detailed swept path analysis assessment by Wynns Ltd which was carried out on a desk top basis. This information was used to negotiate road improvements with the local authority.
Rothes Wind Farm Cadzow Swept path analysis of pinch points on route to show access requirements in support of a planning application. Physical site inspection and surveys.
Aberystwyth Marine Access associated with Cefn Croes Wind Farm Capita Symonds At short notice Wynns were commissioned to undertake a feasibility study into the possible access for AIL’s from offloading sites in West Wales as part of the Highways Agency’s water preferred policy.
Cleve Hill E.ON-UK Renewables London Array Detailed additional survey works on access via county roads to proposed onshore substation location for transformer delivery.
Gorrenberry Wind Farm Eco 2 High level review of AIL access. Wynns undertook route inspection and advised on works required to consider whether AIL access was viable and to enable the project to progress.
Marks Hill ENTEC Desk top swept path analysis of turbine equipment over a listed structure to confirm access requirements.
Enochdhu Wind Cluster Environ Transport study to determine appropriate access routes for AIL’s to be delivered to the site including site visits and studies into road transport in terms of structural and negotiability issues.
Pates Hill Wind Farm Give Svaergods Transport Surveys and swept path analysis of possible AIL access routes to confirm negotiability inclusive of street furniture removal requirements prior to movement applications by haulier.
Rothes Wind Farm Give Svaergods Transport Swept path analysis of pinch points on route to show access requirements considerate of the installation of new road signs by local authority.
Carraig Gheal Wind Farm Green Power Marine access study for beach landing access. Site visits and recommendations for necessary remedial works.
Carraig Gheal Wind Farm Phase 2 Works Green Power Revised access study to consider marine and road transport access requirements with a view to accessing the site from the south, an alternative access point to that originally considered.
Sudbrook Paper Mill Independent Power Systems High level site inspection and photographic report to advise on possible access to site which was known to be problematical due to a railway bridge. The site was for a single turbine proposal for an industrial site.
Clyde Wind Farm Mott MacDonald Transport access study considerate of possible transformer access to the substation site within the wind farm as a contingency against requiring transformer access prior to the construction of wind farm access roads.
Gwynt y Mor NPower Renewables Consideration of AIL access for transformers to a proposed on site substation connection in relation to a new offshore windfarm connection. Including requirements for the design of site access roads. Site inspections and detailed structural and negotiability studies provided to client.
Mynydd y Gwair Wind Farm NPower Renewables Transport study to determine appropriate access routes for AIL’s to be delivered to the site including studies into port access and road transport, including instrument survey and swept path analysis of pinch points on route.
Neuadd Goch Wind Farm NPower Renewables Transport study to determine appropriate access routes for AIL’s to be delivered to the site including road transport structural status and swept path analysis of pinch points on route.
Rhyl Flats Offshore Wind Farm NPower Renewables Consideration of AIL access for transformers to a proposed on site substation connection in relation to a new offshore windfarm connection. Site inspections and detailed structural and negotiability studies provided to client.
TAN 8 Area A Wind Farm Studies NPower Renewables High level route inspection and photographic report. AIL access assessment to various possible site access points within the Welsh Tan 8 Forestry Commission Wales Strategic Search Area A.
Vehicle Specifications Nuon Renewables Desk top summary of potential AIL and Construction and Use vehicles in terms of maximum dimensions expected for delivery vehicles.
Windmill Hill Business Park RWE npower Transport study and construction review for the delivery and installation of a 3MW machine to site including negotiability survey, swept path analysis and structural approval investigations. Single turbine scheme.
Central Scotland Windfarm Sites Group 4 Scottish & Southern Energy Transport studies to determine appropriate access routes for AIL’s to be delivered to the 3 sites of Waterhead Moor, Harrows Law & Drummond, including site inspections and studies into port access and road transport.
Harrows Law Scottish & Southern Energy Additional Surveys to 2004 study works. Desk top swept path analysis of potential turbine components to site. Topographical survey information provided by client.
Waterhead Moor Phase 2 Revised Access Works Scottish & Southern Energy Additional works in relation to the wind farm investigated in 2004. Alternative access point now proposed by client and revised AIL access study to this point was undertaken in terms of structural and negotiability requirements.
Highland Windfarm Sites Group 1 Scottish & Southern Energy Transport studies to determine appropriate access routes for AIL’s to be delivered to the 4 sites of Ackron, Braubster, Strathy North & Strathy South including site inspections and studies into port access and road transport.
Waterhead Moor Scottish & Southern Energy Additional survey works on proposed access route identified in 2004 works. Desktop swept path analysis undertaken of detailed topographical information provided by client.
Whitelee Scottish Power Transport study into possible road access into site for new transformers associated with the wind farm substation connection. Possible alternative routes to wind turbine components considered.
Friardyke Substation (Crystal Rigg Wind Farm Phase II) Scottish Power Power Systems Transport study in consideration of transformer delivery requirements to the wind farm substation.
Newfield Scottish Power Power Systems Transport study in consideration of transformer delivery requirements to the proposed wind farm substation.
Waterhead Moor Scottish Power Power Systems Transport study in consideration of transformer delivery requirements to the wind farm substation.
Cleve Hill Shell Wind Energy Limited Consideration of AIL access for transformers to a proposed on site substation connection in relation to a new offshore windfarm connection. Swept path analysis of route pinch points also undertaken.
A'Chruach Wind Farm Terence O'Rourke & Novera Energy Full traffic and transport assessment undertaken in support of planning application.
Milford Haven Wind Farm Total Full transport assessment considerate of marine and road transport requirements for 4.5MW turbines. Detailed consideration of sensitive site access for AIL’s through a live oil terminal site required. Detailed explanation of AIL load classifications also provided to client.
Milford Haven Wind Farm Phase 2 Total Further works in relation to the project undertaken in 2005 in terms of detailed logistical plans for possible construction delivery requirements including cost estimates for delivery of all items.
Lamomby Wind Farm Veryards Desk top swept path analysis of proposed access route pinch points from M6 motorway to site. Survey information provided by client.
Limmer Hill West Coast Energy Full transport assessment including consideration of AIL and Construction and Use traffic. Site access roads also considered in support of planning application.
Llaneli Wind Farm West Coast Energy High level route inspection only. Physical route survey and photographic report to enable client to identify any major risks to site access requirements.
Mynydd yr Hendre West Coast Energy High level route inspection only. Immediate report required by client on main access issues and risks to project feasibility.
Twyn Du Wind Farm West Coast Energy High level route inspection only. Physical route survey and photographic report to enable client to identify any major risks to site access requirements.
Lower Winterborne Windfarm Your Energy Transport study to determine appropriate access routes for AIL’s to be delivered to the site including site visits and investigations into port access and road transport. Specialist advice required by client with regard to site line requirements for access from trunk roads to site after concerns raised by Highways Agency during planning process. Possible need for a section 278 agreement.